EPISODE 2: The Rebuilding Begins


Finally, there are signs of real plumbing in the bathroom. This is where the 4' vanity/sink will go

Finally, the tub is set in place:

Here's another view:

With the tub in place, I started with the back wall:

Then, I added the side walls:

Next